When water is getting in somewhere and nobody will say where from, we trace it. The report sets out what was found, what caused it and what the standard requires, in terms your builder has to answer.
A defect investigation is measured against the Guide to Standards and Tolerances 2015, the National Construction Code and ABCB Housing Provisions, AS 3700 for masonry, AS 3740 for wet areas, and your contract drawings and specification.
0 checkpoints across 0 areas on a standard Mickleham defect investigation report. Anything locked, sealed or stacked with materials on the day is listed as not inspected. We do not pass what we could not reach.
From an investigation into water entering a garage roof at Mernda, in the northern corridor.










New Construction Stage Inspections Seven checks across a Mickleham build, each timed for the moment before the work disappears behind the next trade.
Pre-Handover (PCI) Inspections The inspection before you accept keys, which in Mickleham still turns up structure as well as finishes.
Pre-Purchase Building Inspections What a Hume corridor home is really like behind the presentation, reported under AS 4349.1.
Building and Pest Inspections Building and timber pest together, including whether the termite barrier has been bridged. Instant online pricing, or talk to the booking team on 1300 471 805.
No. An investigation report is prepared for the owner and the builder to work from. The Building and Plumbing Commission dispute resolution service and VCAT need an expert witness report written to the VCAT practice note. We can upgrade it if it goes that far.
We do not open up finished work, provide engineering certification, take geotechnical samples or carry out the repair. Where an engineer is needed the report says so.
That is the job. We work back from the damage to the entry point rather than describing the stain, which is what makes the report usable.