What our inspectors find in Mickleham VIC
This is our own record rather than general advice. Across fifteen Mickleham inspection dates between August 2025 and August 2026, our inspectors photographed findings at every stage. Of the 148 selected for this site, 63 were classified as major structural defects or safety hazards, and those came almost entirely from slab and frame.
Fully licensed & accredited
-
Building & Plumbing Commission -
Australian Society of Building Consultants -
Strata Community Association -
Building Dispute Practitioners Society
Major structural and safety findings concentrate at slab and frame stage.
Bracing missing from the engineering plans is the most serious recurring frame item.
Slab level outside tolerance and frame overhang at the slab edge both repeat.
Lock-up findings are dominated by sarking damage and cladding clearance.
Pre-handover still produces structural items, not only finishes.
More about Mickleham
- Building a new home in Mickleham VIC
- Buying an established home in Mickleham VIC
- Growth and development in Mickleham VIC
- Permits, council and building disputes in Mickleham VIC
- Soil, slabs and movement in Mickleham VIC
- Termite risk and pest inspections in Mickleham VIC
- Site conditions, wind and roofing in Mickleham VIC
Written by our local inspection team from work carried out in Mickleham. Licensed building practitioners.